DMA 138: SALISBURY, MD
WBOC Sees The Light, Building Solar Farm
The installation will deliver 908 killowatts, enough to supply all the power needs at Draper Holdings’ Salisbury, Md., CBS-Fox affiliate.
The installation will deliver 908 killowatts, enough to supply all the power needs at Draper Holdings’ Salisbury, Md., CBS-Fox affiliate.
16 May 2024
23 May 2024